Wilhelminahaven is 1,200 meters long with a width of 275-300 metres, a depth of 15.0 to 17.0 metres and a quay length of 1,250 metres. It is a dedicated basin in the logistics for power production (coal, biomass, gypsum, fly ash). The southern quay is 450 metres and is used to unload coal carriers for the RWE Essent power plant. The southern part of the basin also hosts a public loading and unloading facility for inland vessels with a design depth of 7 metres. The facility is also possible for seagoing vessels, but only under special conditions. The northern quay of 525 metres is mainly used for project cargo (e.g. offshore wind) and the eastern quay to tranship gypsum and fly ash and in future biomass. Nuon/Vattenfal operates a gas fired powerplant at the northern part of the basin.

FACTS & FIGURES

Length: 1200 m
Width: 275-350 m
Draught max.: 15 m
Jacking permitted: Nee

Quay age (north): 525 m (druk 4-6 ton/m2)
Quay age (south): 450 m (druk 4-6 ton/m2)
Quay age (east): 275 m (druk 4-6 ton/m2)

Quay width: 40 m
Quay height: 5,5 m

BUSINESS MANAGERS

ERIK BERTHOLET
business manager logistics & offshore wind
E-mail: e.bertholet@groningen-seaports.com
Phone: +31 (0)65 393 9275

ROBERT VAN TUINEN
business manager energy- & dataport
E-mail: r.vantuinen@groningen-seaports.com
Phone: +31 (0)62 224 3300

WP-Backgrounds Lite by InoPlugs Web Design and Juwelier Schönmann 1010 Wien